Research map / Learning theory and algorithms / Prediction and decision losses
Contract Scheduling With Predictions
Read the paperCheck your idea against 108,967 papers
AI-extracted summary. Written by AI from the paper's title only (no summary yet). Numbers and claims can be wrong or missing context, so check the paper before you cite or build on it.
Measured effects reported in the paper
| What was changed | Where | Measured | Effect |
|---|---|---|---|
| Use the adaptive Robust schedule with H = 0.1 instead of the baseline exponential schedule | Interruption-time prediction · Deadlines in [2,2^{20}] | percentage of interruptions with a longer contract: 88.71% | Helped |
| Use the adaptive Robust schedule with H = 0.1 instead of the baseline exponential schedule | Interruption-time prediction · Deadlines in [2,2^{20}] | percentage with at least 20% longer contract: 66.43% | Helped |
| Set buffer p = 0.1 rather than p = 0.05, 0.2, or 0.3 (ablation) | Adaptive Robust schedule · Interruption-time prediction, H = 0.1 | expected acceleration ratio: 2.23 compared to 2.41, 2.49 and 2.85 | Helped |
| Increase error bound H (ablation) | Adaptive Robust schedule · Interruption-time prediction | percentage of interruptions with a longer contract: 0.983 -> 0.810 | Hurt |
| Increase error bound H (ablation) | Adaptive Robust schedule · Interruption-time prediction | percentage with at least 20% longer contract: 0.776 -> 0.453 | Hurt |
| Set buffer p = 0.1 rather than p = 0.0, 0.2, or 0.3 (ablation) | Oblivious Robust schedule · Interruption-time prediction, H = 0.1 | percentage of interruptions with a longer contract: 0.703, 0.896, 0.936, 0.853, 0.750 | Helped |
| Set buffer p = 0.05 or 0.07 rather than p = 0.0 (ablation) | Oblivious Robust schedule · Binary predictions | percentage of interruptions with a longer contract: 0.623 -> 0.813; 0.876 | Helped |
| Increase query error level (ablation) | Adaptive Robust schedule · Binary predictions | percentage with at least 20% longer contract: 0.703 -> 0.610 | Hurt |
| Use binary-query Robust with p = 0.05, below the assumed H = 0.1 (ablation) | Robust (oblivious) · Binary predictions, H = 0.1 | percentage of interruptions with a longer contract: 89.81% | Helped |
Closest papers by meaning
- Non-clairvoyant Scheduling with Partial Predictions (ICML 2024 · similarity 0.84)
- Non-Clairvoyant Scheduling with Progress Bars (NeurIPS 2025 · similarity 0.82)
- SkipPredict: When to Invest in Predictions for Scheduling (NeurIPS 2024 · similarity 0.82)
- Resilient Byzantine Agreement with Predictions (NeurIPS 2026 · similarity 0.81)
- Algorithms with Calibrated Machine Learning Predictions (ICML 2025 · similarity 0.81)
- Beyond Prediction: Tail-Aware Scheduling for LLM Inference (ICML 2026 · similarity 0.81)
Writing a paper in this area? scime draft is a free LaTeX editor with AI included, real-time co-authors and a check of your references and venue rules before you submit. It also imports OpenAI Prism projects.
