atlas

Research map / Time series / Long-term forecasting

Improving Time Series Forecasting via Instance-aware Post-hoc Revision

NeurIPS 2025 · Time series › Long-term forecasting · approach: Attention for time series forecasting · 0 citations (OpenAlex)

Read the paperCheck your idea against 108,967 papers

AI-extracted summary. Written by AI from the paper's full text. Numbers and claims can be wrong or missing context, so check the paper before you cite or build on it.

Proposes PIR, a model-agnostic post-hoc plugin that estimates per-instance forecasting error and revises backbone forecasts using local covariate/exogenous context and globally retrieved similar series.

Problem

Time series forecasters perform poorly on specific instances due to instance-level variations (distribution shifts, missing data, long-tail patterns), even when average accuracy looks strong.

Approach

A post-forecasting module that predicts the backbone's per-instance MSE as an uncertainty signal, then revises forecasts with a local Transformer over forecasted covariates and exogenous info plus a global retrieval-based weighted average of similar historical series, combined via learned residual gates.

Key results

Measured effects reported in the paper

What was changedWhereMeasuredEffect
Add PIR post-forecasting revisionPatchTST · Long-term and short-term forecasting benchmarks, 48 experimental settingsMSE reduction: 8.99%Helped
Add PIR post-forecasting revisionSparseTSF · Long-term and short-term forecasting benchmarksMSE reduction: 25.87%Helped
Add PIR post-forecasting revisioniTransformer · Long-term and short-term forecasting benchmarksMSE reduction: 3.47%Helped
Add PIR post-forecasting revisionTimeMixer · Long-term and short-term forecasting benchmarksMSE reduction: 2.34%Helped
Add local revision (ablation)PIR with PatchTST · Electricity and PEMS03MAE: 0.270 -> 0.253; 0.192 -> 0.183Helped
Add global revision (ablation)PIR with PatchTST · Electricity and PEMS03MAE: 0.257 -> 0.253; 0.201 -> 0.183Helped
Add the auxiliary uncertainty-error constraint (ablation)PIR · ETTm1forecasting accuracyHelped
Increase backbone depth to match PIR's added layers (ablation)iTransformer · Electricity and Weatherforecasting accuracy: 0.147 vs 0.145; 0.177 vs 0.170 (MSE, horizon 96)Mixed
Train PIR without a pretrained forecasting backbone (ablation)PIR · Electricity and Weatherforecasting accuracy: 0.145 -> 0.164; 0.170 -> 0.217 (MSE, horizon 96)Hurt
Replace cosine-similarity retrieval with LSH (ablation)PIR · ETTh1 and Trafficinference time: 0.024 -> 0.415; 0.079 -> 87.957Hurt

Surprising findings

Limitations

Experimental setup

Datasets: ETT Electricity Solar Weather Traffic PEMS03 PEMS04 PEMS07 PEMS08 Energy (Time-MMD) Health (Time-MMD)

Benchmarks: ETTh1 ETTh2 ETTm1 ETTm2 Electricity Solar Weather Traffic PEMS03 PEMS04 PEMS07 PEMS08

Metrics: MSE MAE

Baselines: PatchTST SparseTSF iTransformer TimeMixer TFT TiDE NBEATSx TimeXer RAFT RATD RATSF

Builds on: PatchTST iTransformer SparseTSF TimeMixer RAFT

Closest papers by meaning

Writing a paper in this area? scime draft is a free LaTeX editor with AI included, real-time co-authors and a check of your references and venue rules before you submit. It also imports OpenAI Prism projects.

Open scime draft

Get the next scime Dispatch and a monthly field update

Free. We send a confirmation link first; every email has a one-click unsubscribe. Privacy