atlas

Research map / Graph learning / Graph algorithms and clustering

Towards Optimizing Large-Scale Multi-Graph Matching in Bioimaging

CVPR 2025 · Graph learning › Graph algorithms and clustering · approach: Optimization algorithms for graph matching · 1 citations (OpenAlex)

Read the paperCheck your idea against 108,967 papers

AI-extracted summary. Written by AI from the paper's full text. Numbers and claims can be wrong or missing context, so check the paper before you cite or build on it.

Proposes GREEDA, a greedy construction plus GM and swap local-search solver for incomplete, sparse multi-graph matching, and shows it scales to a 100-worm bioimaging instance where prior methods run out of memory.

Problem

Multi-graph matching for large-scale, incomplete, sparse bioimaging problems (100 C. elegans worms, ~45M keypoint correspondences), where existing MGM methods assume complete or dense settings and are too slow or infeasible.

Approach

Decomposes multi-graph matching into a chain or tree of pairwise graph-matching subproblems solved with a black-box GM solver (guaranteeing cycle consistency and allowed matches), plus parallel GM-based local search and a novel 2-clique swap local search formulated as a quadratic pseudo-boolean problem.

Key results

Measured effects reported in the paper

What was changedWhereMeasuredEffect
use parallel GM local search instead of sequential GM local search (ablation)GREEDA · worms-10convergence speedHelped
use incremental construction instead of the other tested construction methods (ablation)GREEDA · worms-10objective valueNo clear effect
use incremental construction instead of the other tested construction methods (ablation)GREEDA · worms-10runtimeHurt
parallelize GM local search by accepting profitable proposals, rather than accepting only the best-improvement proposal (ablation)GREEDA · worms-10convergence speedHelped
change among sequential, parallel, and incremental construction methods (ablation)GREEDA · worms-10final objective valueNo clear effect
use GREEDA instead of MP-Tworms-29 · worms-29construction time: half an hour to just two minutesHelped
use GREEDA instead of MP-Tworms-29 · worms-29objective valueHelped
use GREEDA instead of MP-Tworms-100 · worms-100feasible-solution runtimeHelped
use MP-T on worms-100MP-T · worms-100memory feasibilityHurt

Surprising findings

Limitations

Experimental setup

Datasets: worms-10 worms-29 worms-100 synthetic CMU hotel CMU house

Benchmarks: worms-29 worms-100 synthetic CMU hotel CMU house

Metrics: objective value (total cost) runtime

Baselines: MP-T DS* Projected power iteration Sparse Stiefel Synchronization Spectral synchronization with SBR

Builds on: QPBO-I MP-T DS* multi-dimensional assignment local search

Closest papers by meaning

Writing a paper in this area? scime draft is a free LaTeX editor with AI included, real-time co-authors and a check of your references and venue rules before you submit. It also imports OpenAI Prism projects.

Open scime draft

Get the next scime Dispatch and a monthly field update

Free. We send a confirmation link first; every email has a one-click unsubscribe. Privacy